(800)576-1921
sales@demartini.com

2001 Monaco Windsor 36WBSStock #: 3489

Sale Price - $64,900
Vehicle Summary
Chassis Roadmaster 
Generator Onan 7.5 KW Diesel 
Engine Cummins ISC 350HP Diesel 
Category Class A - Diesel 
Mileage 70,839 
Slide Out Slide-Out 
Fuel Diesel 
Condition Used 


2001 Monaco Windsor 36WBS Slide-Out Class A Diesel Motorhome. This coach is built on a Roadmaster chassis and powered by a Cummins ISC 350HP Diesel Engine with only 70,839 miles! Equipment includes: Hydro-Hot Water System, Aluminum Wheels, Pass Through Slide-Out Storage Tray, Air Leveling System, 2000 Watt Inverter, 3M Film Front Mask, Full Encased Awnings, Window Awning(s), Front Door Awning, Auto Patio Awning, Dual Ducted Roof A/Cs w/Heat Pumps, Energy Management System, Jake Brake, Adjustable Pedals, CB Radio, Rear View Camera, Power Leather Cockpit Seats, Co-Pilot Power Footrest, Power Sunvisors, CD Player, and Water Purifier, Combination Washer/Dryer, Safe, VCR, DVD Player, Home Theater System, TV in Bedroom, TV in Cockpit, 4-Door Refrigerator w/Icemaker, Convection Microwave, Solid Surface Countertops. Equipped with a Onan 7.5KW diesel Generator with only 261 hours. The Floorplan features: Slide-Out, Leather Recliner, Fabric Sleeper Sofa, Tile Floor in Kitchen/Bath, Dinette Table and Chairs, Open Bath, Queen Bed. Asking only $64,900! Item #3489 DeMartini RV Sales

VIN: 013292


Generator Hours:261

Exterior Equipment

  • Hydro-Hot Water System
  • Aluminum Wheels
  • Pass Through Slide-Out Storage Tray
  • Air Leveling System
  • 2000 Watt Inverter
  • 3M Film Front Mask
  • Full Encased Awnings
  • Window Awning(s)
  • Front Door Awning
  • Auto Patio Awning
  • Dual Ducted Roof A/C's w/Heat Pumps
  • Energy Management System

Interior Equipment

  • Water Purifier
  • Combination Washer/Dryer
  • Safe
  • VCR
  • DVD Player
  • Home Theater System
  • TV in Bedroom
  • TV in Cockpit
  • 4-Door Refrigerator w/Icemaker
  • Convection Microwave
  • Solid Surface Countertops

Cockpit Options

  • Jake Brake
  • Adjustable Pedals
  • CB Radio
  • Rear View Camera
  • Power Leather Cockpit Seats
  • Co-Pilot Power Footrest
  • Power Sunvisors
  • CD Player

Bedroom Layout

  • Queen Bed

Dining/Flooring

  • Tile Floor in Kitchen/Bath
  • Dinette Table and Chairs

Furnitures

  • Leather Recliner
  • Fabric Sleeper Sofa

MSRP Sheet

2001 Monaco Windsor 36WBS MSRP Sheet

DeMartini RV Sales works with the top banks and lenders in order to get you the best rates and most flexible RV financing available. We are professionals at negotiating RV finance terms with the banks and take the hassle out of the process for you. Give us a try and you can discover how affordable and easy financing an RV can be. We can work to get you the following finance benefits:

  • Same-day RV financing
  • Finance terms up to 20 years
  • Affordable payments that fit your budget

Talk to one of our Finance Managers today, financing an RV may actually be a better option than paying cash with today's low rates. Your loan interest can possibly be tax deductible as a second-home mortgage interest. We would be happy to take a look at your situation and explain your finance options. Give us a call at 1.800.576.1921 or fill out our secure online credit application to get started today!

Submit Credit App

RV Insurance Quote

Fill out our online insurance quote form and we will get back to you with a competitive quote from the best RV Insurance providers.

Get an RV Insurance Quote

Extended Service Contract Quote

Are you PROTECTED?

DON'T let unexpected repair costs RUIN YOUR FUN!

Click below for a free quote on an Extended Service Contract and Tire & Wheel Protection for your RV.

Get an Extended Service Quote




































*Price does not include sales tax or registration. Non-California residents are not subject to California sales tax or registration.

**DeMartini RV Sales is not responsible for any typos or errors on our webpages. We believe manufacturer supplied specifications on this site to be accurate at the time of posting. However, specifications, standard equipment, model availability, options, fabrics, and colors are subject to change without notice. Some vehicles may be pictured with equipment that is only available as an option at an extra cost or unavailable on some models. You should confirm equipment and availability by speaking with a salesperson.